Stellar Grove · Research

Stellar Grove · Case study

B02 · Enhanced rock weathering — how many soil cores does it take to verify carbon removal?

How many fields and soil cores does it take to verify basalt-driven CO2 removal at a realistic spreading rate?

Synthetic case study. Simulated data, not field observations. Seed 260102.

Headline: At a realistic 20 t/ha dose the removal signal (~0.4 t CO2/ha/yr) is smaller than core-to-core noise; verification is a question of how many fields you sample, not how many cores you take in each.

Findings

Truth check — does the analysis recover what was planted?

QuantityPlanted truthEstimate95% intervalRecovered?
Dose slope at 5 cm2.000 t CO2/ha/yr per 100 t basalt1.669 t CO2/ha/yr per 100 t basalt[0.296, 3.042]yes
Dose slope at 10 cm1.500 t CO2/ha/yr per 100 t basalt1.764 t CO2/ha/yr per 100 t basalt[0.268, 3.259]yes
Dose slope at 30 cm0.600 t CO2/ha/yr per 100 t basalt0.223 t CO2/ha/yr per 100 t basalt[-1.550, 1.997]yes

Plausibility checklist

Plausibility checkResultDetail
True CDR at the highest dose sits inside the published 1–3.85 t CO2/ha/yr band (±20%)passobserved 2.520 t/ha/yr; target [1.020, 4.620] t/ha/yr
Core-level measurements within ±15–20 t CO2/ha/yrpassobserved [-7.068, 7.670]; allowed [-15, 20]
16 plots × 3 depths × 3 corespass144 rows
Monte Carlo power agrees with normal approximation (±0.06)passMonte Carlo 0.314 vs normal approx 0.319 (20 fields × 5 cores)

Figures

Power to verify removal at a 20 t/ha application, by fields and cores
Power to verify removal at a 20 t/ha application, by fields and cores
Dose–response slope by sampling depth: estimate vs planted truth
Dose–response slope by sampling depth: estimate vs planted truth
5 cm porewater-inferred removal vs control, by basalt rate
5 cm porewater-inferred removal vs control, by basalt rate