The yellow-light dilemma
When the light turns amber, can a driver always either stop in time or get through before red?
Chapter 9 · Building a model: adapting, extending, and combining. A worked example rebuilt from the chapter's topic in Mike Mesterton-Gibbons, *A Concrete Approach to Mathematical Modelling*; the scenario and numbers are our own illustration, not the book's text.
Headline: At 60 km/h with a 3-second amber, a driver between 25 m and 63 m from the line can do neither: a 38 m dilemma zone. Removing it takes an amber of 5.3 s at this speed.
- 38 mdilemma zone at 60 km/h
- 5.3 samber needed at 60 km/h
- 5.1 samber needed at 50 km/h
The problem
A driver approaching a junction at 60 km/h sees the light turn amber. Stopping needs room; going needs time to cross a 20 m junction before red. This builds a new model by combining two earlier ones: the stopping distance (Chapters 2 and 4) and constant-speed travel.
The model
Let be the distance to the stop line when the amber starts, s the reaction time and m/s² a comfortable deceleration. The driver can stop if
and can go, holding speed, if the car's back clears the junction (width m, car length m) within the amber :
If , drivers between the two distances can do neither: the dilemma zone (Gazis, Herman and Maradudin, 1960). It vanishes when , which gives the minimum amber:
At 60 km/h ( m/s), m and m.
Try it
Dilemma-zone explorer
Drag the sliders; hover the chart to read values.
Key findings
- The amber needed is U-shaped in speed: slow cars need long to clear the junction, fast cars need long to stop. It is smallest, 5.1 s, at 44 km/h, so a 3-second amber leaves a dilemma zone at every speed shown.
- Set the amber for the speed limit: 5.1 s at 50 km/h, 5.3 s at 60 km/h. This is the basis of the traffic-engineering formula for amber timing (which adds the junction-clearing term as an all-red interval).
- Combining models is mostly bookkeeping: two small, separately validated pieces answer a question neither answers alone, and the dilemma zone's existence follows from their different growth rates in .
from books.concrete_mathematics import building as bu
d = bu.dilemma_zone(v=16.667, reaction=1.0, decel=3.0, amber=3.0, width=20.0, length=5.0)
print([round(x, 1) for x in d.zone], round(d.min_amber, 2))
print(round(float(bu.amber_needed(50 / 3.6, 1.0, 3.0, 20.0, 5.0)), 2))
# → [25.0, 63.0] 5.28
# → 5.11
Assumptions and extensions
- Constant speed through the amber. Drivers who accelerate shrink the zone (the
accelargument); those who hesitate enlarge it. - One reaction time. Real reaction times vary from about 0.7 to 1.5 s; the zone is a band, not a line.
- Red-light cameras and countdown timers change behaviour, which feeds back into the model's parameters.